Showing posts with label frame. Show all posts
Showing posts with label frame. Show all posts

Monday, 21 July 2014

What's next?

Hi,

So it has been a while since we blogged our progress on the bus conversion. A lot has been happening, although to most people it looks like not much at all :)

Sleeps 4
Testing to see if the bathroom door fits

Adrian has finished the frame work for the bathroom and fridge. And he has welded up the rectangle frames for the bunk beds, these will be held in place by the plywood walls.

Sleeps 4
The frames for the bunk beds

The floor has been replaced in the back half of the bus. And insulation has been put in the walls and ceiling, we have used styrofoam sheets and can already feel the difference. I will take pics of this before the finishing sheets go on.

Sleeps 4
Testing a wall sheet to see if it curves around the wall

Last week we picked up the plywood sheets for finishing the walls and ceiling. We also picked up alloy strips for finishing edges along the ceiling.

Sleeps 4
Getting an idea of what the ceiling will look like

There is lots happening and the push is on to have her ready for our first big trip in October!

Bye for now, Adrian and Jess

 

Friday, 4 April 2014

Windows in and bathroom begins

Hi all,

So the windows are all in. There is still some painting to be finished but structurally the outside is done. Oh, except for the awning. And the roof is going to be repainted and repaired.

Ad started to work on the bathroom and realised that we put the window in the wrong place so that slowed progress a bit. But we have figured out a way around it, otherwise the window would have been moved and I think it would have made the exterior look messy.

While the floor is up he is fixing the tank connector as it wasn't letting the water through. All up we should have 1000 litres of fresh water. It looks like a real mess at the moment.

Til next time, Jess

 

Friday, 28 February 2014

We have a window hole

There has been loads of work happening this week!

Adrian is working on one side of the bus at a time. At the moment it is the drivers side that is having the windows done. There is no rust in the frame of the bus, which is a relief because we have seen so many buses get started and then rust is found and it turns into a nightmare.

We have started at the back with the main bedroom framework. And made sure the window would fit....look how small it looks up there! (Not its final position, we are putting it up towards the top more)


Then all the old windows came out.

The next bit of framing for the bunks area was done (I wasn't there to photograph that - might get a pic from the inside later) and some more sheet steel put on and suddenly we have a hole!

And the window looks sooo tiny! It is the smallest you can buy actually but a good size for the bunks and bathroom.

Stay tuned! We seem to be on a roll!

Jess :)